Commercial Roof Installation Contractor in Queens, NY

Commercial roof installation contractor work is what Hearth Roofing does when a Queens building needs a new flat or low-slope roof. My crew tears off the old system, repairs the deck and installs TPO, EPDM, PVC, modified bitumen or built-up roofing, then handles final inspection and cleanup.

  • TPO
  • EPDM
  • PVC
  • Modified bitumen
  • Built-up
Hearth Roofing crew rolling out a new white TPO membrane over tapered insulation on a Queens commercial flat roof
Tear-off to final inspection
Flashing is our specialty
Flat & low-slope
The right membrane

Matching the membrane to your building

I pick the system that fits the building, not the easiest sale. When it suits the roof better, I'll also price spray foam as the commercial alternative.

Swipe to see the full table

System Installed Best at Suits
TPO Heat-welded seams Energy-efficient reflectivity Warehouses, industrial
EPDM Fully adhered or mechanically fastened Long track record Offices, retail stores
PVC Heat-welded seams Grease and chemicals Restaurants
Modified bitumen Torch or cold-applied Foot traffic Apartments, mixed-use
Built-up Layered plies and asphalt Heavy use Schools, churches

Flat roofs on houses and smaller buildings are a separate, lighter job.

The install, step by step

Six steps on every commercial install

Same order on every building, from bare deck to the photos your building manager gets at the end.

  1. Tear-off

    Everything comes off down to the roof deck.

  2. Deck repair

    Repairs wherever wood is soft or steel has rusted.

  3. Tapered insulation

    Pitched so water runs to the roof drains.

  4. Membrane installation

    Adhered or fastened, seams heat-welded or sealed.

  5. Our specialty

    Flashing

    At parapet walls, rooftop units, drains and penetrations, the step I specialize in.

    When the roof still has years left, commercial flashing repair on the existing roof may be enough.

  6. Final inspection & cleanup

    With photos sent to your building manager.

Your building stays open

Your tenants stay open while we work

Before tear-off, your building manager and I agree on a project schedule. We work section by section, and every section opened is watertight before the crew leaves at night.

Rooftop units get disconnected and reset with your HVAC contractor. Debris comes down away from entrances and storefronts, so tenants barely notice us.

  • Schedule agreed first
  • Section by section
  • HVAC units reset
  • Entrances kept clear
Roofing crew working one section of a commercial roof above open storefronts in Queens, with rooftop HVAC units in place
Tenants open below
Every night on site
  1. One section opened
  2. Watertight before the crew leaves
Commercial roof installation FAQ

Before you sign a commercial roofing contract

Another question?(347) 308-6206

Tear-off, deck repair, tapered insulation, membrane, flashing, then inspection and cleanup. Each is detailed in the sequence above.

Free commercial roof estimate

Have me walk your roof first

Any commercial roof installation contractor should walk the roof before quoting it. I'll measure it, check the deck, drains and flashing, and give you a written scope with the system I'd recommend. Call (347) 308-6206 or send the form.

Estimate form

Free, written scope, no obligation

Free Roof Estimate

Let’s look at your roof

Call us now, or leave your details and we’ll call you back within one business day to set up a free on-site estimate anywhere in Queens.

Call for a free estimate (347) 308-6206
or

No cost and no obligation.